Know-How Powertage 2022

INP experts for best energy supply

The INP Schweiz team provided extensive technical know-how to support the construction of a state-of-the-art biopharmaceutical production facility in Switzerland.

During the project duration of over 28 months, two INP specialists managed the entire installation supervision, coordination of commissioning as well as site management in the area of low and medium voltage systems and the entire electrical installation of the electrical systems.

Read more about the project