voltWALL 30kWh Pilot Installation

30kWh Pilot deployment at Stabio Ticino, connected to a Sofar Inverter. We utilise 26 1.2kWh xBlade modules to achieve 30kWh+. xBlades contain Lithium Iron Phosphate chmistry that trebles life time and lowers fire risk.

voltWALL is currently installing its first 5 Pilot Sites with 60kWh, 30kWh, 12kWh, 12kWh, 12kWh respectively. The images above relate to the 30kWh installation in Stabio, Ticino, installed and commissioned 25/04/2022. voltWALL is in the process of raising up to chf1m in Angel funding to fund its modifications to the product resulting from the lessons learnt from the pilot production and its accelerated revenue growth.