Precise Load Forecasting for Intelligent Low-Voltage Grid Management
Discover how Netinium's short-term load forecasting optimizes maintenance planning through intra-day prognoses. Leverage smart meter data for efficient low-voltage grid management and minimize disturbances.
Optimized Maintenance Planning with Precise Load Forecasting
In today's energy landscape, Distribution System Operators (DSOs) face growing challenges from Distributed Energy Resources (DER) and electromobility. Netinium offers an innovative solution: short-term load forecasting based on smart meter data.
How the Technology Works
The Netinium platform automates the monitoring and control of your low-voltage grid through a three-step process:
- Data Collection: Netinium collects PQ data from smart meters for every feeder.
- Topology Generation: The system automatically generates an accurate LV grid topology, including phase recognition and load assignment.
- Forecasting: Combined with historical and actual measurements, Netinium automatically creates a short-term load forecast for the designated area.
Your Benefits at a Glance
By replacing standard load profiles with intra-day prognoses, you benefit from numerous operational improvements:
- More Accurate Maintenance Planning: Optimize scheduled outages based on actual measurements.
- Minimized Customer Disturbances: Schedule interventions when the impact on end consumers is lowest.
- Efficient Outage Management: Isolate and re-dispatch load quickly in case of unplanned outages.
- Avoid Claims: Reduce unnecessary compensation claims through proactive action.
Rely on Netinium's IoT cloud platform to secure your investments, increase efficiency, and drive the integration of renewable energy.